Wind turbine is a complex system engineering, especially the wind turbine. Every link in this system has received much attention. Wind turbine rotor blades must be able to withstand a number of severe test, the wind at the end of the blade can reach 300 kilometers per hour, ultraviolet, water, wind, pollution are a great erosion of the blade. The quality of protective coatings is better, the longer the service life of the blade, the higher the cost benefit of the whole wind power station. OLDODUR to develop a RELIUS coating system for these stringent requirements. Users can choose different products according to the manufacturing method of rotor blades.
Worldwide, RELIUS is an important manufacturer of wind turbine blade coatings. In the world, more than 25000 rotation on the wind turbine rotor blade, Oldenburg, Germany (Oldenburg relius company provides coating system is playing its important role in protecting.
Wind power plants around the world need to make sure that the rotor blades get the best protection. RELIUS high performance coatings can help the wind turbine blade subjected to rain, sun, wind and various environmental impact test. RELIUS OLDODUR provides the GelCoat BASF or BladeCoat coating quality outstanding, the first offshore wind power plant in Beihai, Germany in the offshore wind power plant is relying on RELIUS to provide protection of wind turbine blades.
The RELIUS brand in BASF industrial coatings solutions has been in the leading position in the wind turbine rotor blade coating. In addition to the coast of India, Beihai, Brazil and Japan and other places of wind power generators have also used RELIUS coating. Up to now, there is no offshore wind power plant in germany. Headquarters is located in northern Germany EEM Dengzhou (Emden) of the Bard group will in the North Sea coast to build bridge, the first of this type of wind power plant, Bard group chose has experienced relius as partners.
The power plant of the wind turbine uses the world's largest rotor blade. This is not only a great challenge for the design and production staff, but also for RELIUS. In the process of development, coating process, to consider how to adapt to the stormy ocean environment, and guarantee the service life of the rotor blade is most important, because only under specific conditions in order to close the large leaf. Many times the weather is due to have to wait a few days to wait for a few days to "climb" power station.
2009 spring, the wind power plant consisting of 80 wind power stations will be in the northwest of the island, about 100 kilometers away from Beihai Borkum. Since the fall of 2008, the trial operation of the offshore wind power station located in the peripheral part of the Gulf of Hooksiel (near Wilhelmshaven) has been a sign of the commercial use of offshore wind energy. Trial operation power station beach, a distance of about 500 meters, and the next construction of wind power plants, the axle approximately sea level 90 meters, the diameter of the rotor about 120 meters. |